SMS Leveler and Sundwig Shear
Catalogue
Contact Us
Project Details
Terms & Conditions


Europe’s second largest steel producer, ThyssenKrupp, shuttered the German facility in September 2021. During its operation, the heavy plate rolling mill facility produced approximately 850,000 metric tons of steel which was used for shipbuilding, offshore and heavy fabrication construction production.
Available for sale:
SUNDWIG Rotating Dividing Shear (1997)
Capacity: 2000mm x 13mm
SMS Leveller (1990)
Capacity: 2000mm x 13mm
Available for sale:
SUNDWIG Rotating Dividing Shear (1997)
Capacity: 2000mm x 13mm
SMS Leveller (1990)
Capacity: 2000mm x 13mm